{"id":18840,"date":"2026-09-13T02:16:58","date_gmt":"2026-09-13T02:16:58","guid":{"rendered":"https:\/\/www.yulidapower.com\/?p=18840"},"modified":"2026-10-10T01:00:43","modified_gmt":"2026-10-10T01:00:43","slug":"plan-de-controle-qualite-des-batteries-externes","status":"publish","type":"post","link":"https:\/\/www.yulidapower.com\/fr\/power-bank-quality-control-plan\/","title":{"rendered":"Plan de contr\u00f4le qualit\u00e9 des batteries externes: IQC, IPQC, OQC and AQL"},"content":{"rendered":"<h1 class=\"wp-block-heading has-text-align-center\">Plan de contr\u00f4le qualit\u00e9 des batteries externes: IQC, IPQC, OQC and AQL<\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">A power bank quality control plan defines incoming checks (IQC), assembly controls (IPQC), finished-unit tests and outgoing lot inspection (OQC). For each check, agree on the method, frequency, acceptance limit and record. Use AQL sampling for suitable lot-inspection items, alongside the product\u2019s required safety and functional controls.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ces contr\u00f4les ont des r\u00f4les diff\u00e9rents. L\u2019\u00e9chantillonnage AQL ne remplace ni les contr\u00f4les de polarit\u00e9 \u00e0 100%, ni la ma\u00eetrise du firmware, ni la qualification de s\u00e9curit\u00e9. Une inspection finale ne peut pas non plus reconstituer les preuves perdues lorsque des lots de cellules sont m\u00e9lang\u00e9s ou que les r\u00e9glages de soudage ne sont pas enregistr\u00e9s. Pour un acheteur OEM, l\u2019objectif concret est de disposer d\u2019une cha\u00eene tra\u00e7able, de la sp\u00e9cification approuv\u00e9e au carton exp\u00e9di\u00e9.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Buyer checklist: agree these acceptance rules before production<\/h2><p>Use this checklist with the approved product specification. Enter project-specific limits and responsibilities; the table does not prescribe one AQL or test limit for every power bank.<\/p><figure class=\"wp-block-table\" style=\"overflow-x:auto;\"><table><thead><tr><th>D\u00e9cision<\/th><th>\u00c9l\u00e9ments \u00e0 d\u00e9finir<\/th><th>Preuves \u00e0 conserver<\/th><\/tr><\/thead><tbody><tr><td>Approved construction<\/td><td>SKU, cell, PCBA, firmware, cable and artwork revisions<\/td><td>Signed specification and approved sample record<\/td><\/tr><tr><td>Inspection coverage<\/td><td>Checks on every unit, sampled checks and qualification tests<\/td><td>Control plan with method, frequency and responsible person<\/td><\/tr><tr><td>Performance limits<\/td><td>Capacity, charging profiles, sustained output and temperature conditions<\/td><td>Measured results linked to sample and equipment IDs<\/td><\/tr><tr><td>Lot acceptance<\/td><td>Lot definition, defect classes, standard\/edition, sampling plan and acceptance\/rejection numbers<\/td><td>Random-sample selection and complete OQC report<\/td><\/tr><tr><td>Failure response<\/td><td>Quarantine, sorting or rework, reinspection and release authority<\/td><td>Original failure, corrective action and retest records<\/td><\/tr><tr><td>Traceability and changes<\/td><td>Component-lot links and written approval for affected changes<\/td><td>Batch records and approved change notices<\/td><\/tr><\/tbody><\/table><\/figure><p>Review <a href=\"https:\/\/www.yulidapower.com\/fr\/controle-qualite\/\">YULIDA\u2019s factory processus de contr\u00f4le qualit\u00e9<\/a> ou <a href=\"https:\/\/www.yulidapower.com\/fr\/contactez-nous\/\">request the inspection scope and available records for your model<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Que couvre un plan de contr\u00f4le qualit\u00e9 des batteries externes ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Un plan de contr\u00f4le utilisable pr\u00e9cise ce qui est v\u00e9rifi\u00e9, \u00e0 quel moment, selon quelle m\u00e9thode de mesure, qui prend la d\u00e9cision et ce qui se passe en cas d\u2019\u00e9chec. Il s\u2019applique \u00e0 la r\u00e9f\u00e9rence SKU et \u00e0 la r\u00e9vision de production exactes, pas simplement au nom d\u2019une gamme figurant sur un devis.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le plan couvre g\u00e9n\u00e9ralement :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Les fournisseurs, les mat\u00e9riaux et les sp\u00e9cifications de composants approuv\u00e9s.<\/li>\n\n\n\n<li>L\u2019inspection \u00e0 r\u00e9ception et la tra\u00e7abilit\u00e9 des lots.<\/li>\n\n\n\n<li>L\u2019approbation de la premi\u00e8re pi\u00e8ce au d\u00e9marrage de la ligne et apr\u00e8s un changement de s\u00e9rie.<\/li>\n\n\n\n<li>Les param\u00e8tres d\u2019assemblage ma\u00eetris\u00e9s et les contr\u00f4les en cours de fabrication.<\/li>\n\n\n\n<li>Les fonctions contr\u00f4l\u00e9es \u00e0 100% en fin de ligne, que chaque unit\u00e9 doit valider.<\/li>\n\n\n\n<li>Les contr\u00f4les par \u00e9chantillonnage des performances, de la qualit\u00e9 de r\u00e9alisation et de la fiabilit\u00e9.<\/li>\n\n\n\n<li>L\u2019inspection al\u00e9atoire finale et l\u2019autorit\u00e9 habilit\u00e9e \u00e0 autoriser l\u2019exp\u00e9dition.<\/li>\n\n\n\n<li>La ma\u00eetrise des produits non conformes, les retouches et la r\u00e9inspection.<\/li>\n\n\n\n<li>La ma\u00eetrise des modifications techniques et la conservation des enregistrements.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Chaque point doit comporter une exigence mesurable. \u00ab Aspect satisfaisant \u00bb reste vague. \u00ab Aucun jeu sup\u00e9rieur \u00e0 l\u2019\u00e9chantillon limite approuv\u00e9 ; position du logo dans la tol\u00e9rance du plan ; aucune ar\u00eate vive expos\u00e9e \u00bb donne \u00e0 l\u2019inspecteur des crit\u00e8res applicables.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Quelle est la diff\u00e9rence entre IQC, IPQC et OQC ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">IQC, IPQC et OQC d\u00e9signent des inspections \u00e0 diff\u00e9rents stades de la production. Ils doivent reposer sur la m\u00eame sp\u00e9cification produit, les m\u00eames d\u00e9finitions de d\u00e9fauts et la m\u00eame identification des \u00e9chantillons.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u00c9tape<\/th><th>Question principale<\/th><th>Contr\u00f4les courants des batteries externes<\/th><th>D\u00e9cision<\/th><\/tr><\/thead><tbody><tr><td>IQC : contr\u00f4le qualit\u00e9 \u00e0 r\u00e9ception<\/td><td>Ces mat\u00e9riaux et composants sont-ils ceux qui ont \u00e9t\u00e9 approuv\u00e9s, et peuvent-ils \u00eatre autoris\u00e9s pour la production ?<\/td><td>Identification et lot des cellules, tension \u00e0 vide, dimensions, r\u00e9vision de la PCBA, contr\u00f4les des connecteurs et c\u00e2bles, pi\u00e8ces plastiques, \u00e9tiquettes et emballage<\/td><td>Lib\u00e9rer, mettre en quarantaine ou rejeter le lot re\u00e7u<\/td><\/tr><tr><td>IPQC : contr\u00f4le qualit\u00e9 en cours de fabrication<\/td><td>La ligne fabrique-t-elle le produit selon le proc\u00e9d\u00e9 approuv\u00e9 ?<\/td><td>Premi\u00e8re pi\u00e8ce, appairage des cellules, param\u00e8tres de soudage, brasage, positionnement de l\u2019isolation, firmware, couple de serrage, adh\u00e9sif et contr\u00f4les d\u2019assemblage<\/td><td>Poursuivre, arr\u00eater, corriger ou isoler la production en cours<\/td><\/tr><tr><td>Essais de fin de ligne<\/td><td>Chaque unit\u00e9 termin\u00e9e assure-t-elle les fonctions de base requises ?<\/td><td>Charge, sortie, profils des protocoles USB, indicateurs, boutons, courant de veille et r\u00e9ponse de base des protections<\/td><td>Valider ou isoler chaque unit\u00e9<\/td><\/tr><tr><td>OQC : contr\u00f4le qualit\u00e9 avant exp\u00e9dition<\/td><td>Le lot termin\u00e9 satisfait-il \u00e0 la sp\u00e9cification de lib\u00e9ration ?<\/td><td>Inspection visuelle et fonctionnelle al\u00e9atoire, emballage, \u00e9tiquettes, mesures et essais de performance s\u00e9lectionn\u00e9s<\/td><td>Lib\u00e9rer ou rejeter le lot \u00e0 exp\u00e9dier<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Certaines usines utilisent le terme FQC, contr\u00f4le qualit\u00e9 final, pour la v\u00e9rification des unit\u00e9s termin\u00e9es avant l\u2019OQC. L\u2019appellation compte moins que le p\u00e9rim\u00e8tre. L\u2019acheteur doit pouvoir distinguer les contr\u00f4les appliqu\u00e9s \u00e0 chaque unit\u00e9, ceux effectu\u00e9s sur un \u00e9chantillon et les essais destructifs de qualification ou de fiabilit\u00e9.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Que faut-il figer avant le d\u00e9but de la production ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Le contr\u00f4le qualit\u00e9 commence par une configuration de fabrication approuv\u00e9e. Si la d\u00e9finition du produit reste floue, les inspecteurs ne peuvent que comparer un \u00e9chantillon incertain \u00e0 un autre.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Figez les \u00e9l\u00e9ments suivants avant la production en s\u00e9rie :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Mod\u00e8le du produit fini, SKU du client et r\u00e9gion de commercialisation.<\/li>\n\n\n\n<li>\u00c9nergie nominale en Wh, capacit\u00e9 annonc\u00e9e en mAh et tension de r\u00e9f\u00e9rence de chaque valeur revendiqu\u00e9e.<\/li>\n\n\n\n<li>Fabricant des cellules, usine, mod\u00e8le, chimie, grade et p\u00e9riode de fabrication autoris\u00e9e.<\/li>\n\n\n\n<li>R\u00e9vision de la PCBA, r\u00e9vision du sch\u00e9ma et nomenclature ma\u00eetris\u00e9e.<\/li>\n\n\n\n<li>Circuits int\u00e9gr\u00e9s de protection, de charge, de conversion et de protocole USB.<\/li>\n\n\n\n<li>Version du firmware, version des param\u00e8tres et m\u00e9thode pratique d\u2019identification, telle qu\u2019une somme de contr\u00f4le ou une lecture.<\/li>\n\n\n\n<li>Sp\u00e9cification, position et m\u00e9thode de fixation de la NTC.<\/li>\n\n\n\n<li>Interconnexion des cellules, isolation, calage, adh\u00e9sif et mat\u00e9riaux thermiques.<\/li>\n\n\n\n<li>R\u00e9sine, couleur, finition et dimensions du bo\u00eetier, ainsi que les \u00e9chantillons limites approuv\u00e9s.<\/li>\n\n\n\n<li>Connecteurs et c\u00e2bles int\u00e9gr\u00e9s, notamment les exigences relatives aux conducteurs, \u00e0 la longueur et \u00e0 la protection contre la traction.<\/li>\n\n\n\n<li>Maquette des \u00e9tiquettes, marquages r\u00e9glementaires, instructions, accessoires et emballage.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Reliez l\u2019\u00e9chantillon approuv\u00e9 \u00e0 ces enregistrements. Un \u00e9chantillon de r\u00e9f\u00e9rence sign\u00e9 est utile pour la couleur, le toucher et l\u2019assemblage, mais il ne r\u00e9v\u00e8le pas une cellule substitu\u00e9e ou une modification du firmware. Ce r\u00f4le revient \u00e0 la sp\u00e9cification et aux enregistrements dont les r\u00e9visions sont ma\u00eetris\u00e9es.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le <a href=\"https:\/\/www.yulidapower.com\/fr\/specification-produit-pour-batterie-externe\/\">guide YULIDA des sp\u00e9cifications de batteries externes<\/a> explique les \u00e9l\u00e9ments commerciaux et techniques \u00e0 convenir avant l\u2019approbation des \u00e9chantillons.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Que doit v\u00e9rifier l\u2019IQC sur les mat\u00e9riaux et composants re\u00e7us ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">L\u2019IQC doit d\u2019abord v\u00e9rifier l\u2019identification, puis inspecter les caract\u00e9ristiques susceptibles d\u2019affecter la s\u00e9curit\u00e9, le fonctionnement, l\u2019assemblage ou l\u2019aspect. Le lot re\u00e7u doit \u00eatre associ\u00e9 \u00e0 un num\u00e9ro de lot fournisseur, une quantit\u00e9, une date de r\u00e9ception et un statut d\u2019inspection. Les mat\u00e9riaux et composants doivent rester en quarantaine jusqu\u2019\u00e0 leur lib\u00e9ration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les contr\u00f4les pr\u00e9cis d\u00e9pendent de la pi\u00e8ce :<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Mat\u00e9riau ou composant re\u00e7u<\/th><th>Contr\u00f4les d\u2019identification<\/th><th>Inspection ou essai courant<\/th><\/tr><\/thead><tbody><tr><td>Cellules lithium-ion<\/td><td>Fabricant, usine, mod\u00e8le, lot, code de date et sp\u00e9cification approuv\u00e9e<\/td><td>Aspect, dimensions, masse, tension \u00e0 vide, r\u00e9sistance interne en courant alternatif ou continu selon la m\u00e9thode convenue, et capacit\u00e9 par \u00e9chantillonnage si sp\u00e9cifi\u00e9<\/td><\/tr><tr><td>PCBAs<\/td><td>Fournisseur, r\u00e9vision de la carte, r\u00e9vision de l\u2019assemblage, \u00e9tat du firmware et lot<\/td><td>Qualit\u00e9 visuelle de r\u00e9alisation, pr\u00e9sence et orientation des composants, programmation, fonctionnement \u00e9lectrique et v\u00e9rification des composants critiques<\/td><\/tr><tr><td>Ports USB et c\u00e2bles int\u00e9gr\u00e9s<\/td><td>R\u00e9f\u00e9rence de la pi\u00e8ce, fournisseur, plan et lot<\/td><td>Dimensions, \u00e9tat des contacts, ajustement \u00e0 l\u2019insertion, continuit\u00e9, r\u00e9sistance du conducteur et contr\u00f4les m\u00e9caniques par \u00e9chantillonnage<\/td><\/tr><tr><td>Pi\u00e8ces plastiques et m\u00e9talliques<\/td><td>Code mati\u00e8re, empreinte du moule, couleur et lot<\/td><td>Dimensions, d\u00e9fauts de surface, ajustement, couleur par rapport \u00e0 la plage approuv\u00e9e et justificatifs mati\u00e8re si requis<\/td><\/tr><tr><td>Isolation et adh\u00e9sif<\/td><td>Mat\u00e9riau, \u00e9paisseur, fournisseur, dur\u00e9e de conservation et lot<\/td><td>Dimensions, ad\u00e9quation du positionnement, contr\u00f4les d\u2019adh\u00e9rence ou de polym\u00e9risation et conditions de stockage<\/td><\/tr><tr><td>\u00c9tiquettes et emballage<\/td><td>R\u00e9vision de la maquette, langue, SKU et destination<\/td><td>Texte, code-barres, valeurs nominales, dimensions, durabilit\u00e9 de l\u2019impression et configuration des cartons<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Un certificat de conformit\u00e9 peut \u00e9tayer le contr\u00f4le, mais il ne doit pas constituer la seule preuve pour un mat\u00e9riau \u00e0 haut risque. V\u00e9rifiez qu\u2019il identifie bien le fabricant, la pi\u00e8ce et le lot effectivement re\u00e7us par l\u2019usine.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" src=\"https:\/\/www.yulidapower.com\/wp-content\/uploads\/2026\/09\/power-bank-iqc-cell-inspection-600x400-1.webp\" alt=\"Inspection \u00e0 r\u00e9ception des cellules lithium-ion destin\u00e9es \u00e0 la production de batteries externes\"\/><figcaption class=\"wp-element-caption\">Illustration g\u00e9n\u00e9r\u00e9e par IA d\u2019une inspection \u00e0 r\u00e9ception des cellules : identification du lot, tension, r\u00e9sistance, dimensions et \u00e9tat visuel.<\/figcaption><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Comment contr\u00f4ler les cellules lithium-ion re\u00e7ues ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Conservez les lots de cellules s\u00e9par\u00e9s et tra\u00e7ables. Enregistrez le fabricant, le mod\u00e8le exact, le lieu de fabrication le cas \u00e9ch\u00e9ant, le code de date et le lot fournisseur. Si un ordre de fabrication utilise plusieurs lots de cellules, les enregistrements des produits finis doivent indiquer quelle plage de num\u00e9ros de s\u00e9rie ou de cartons a re\u00e7u chaque lot.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L\u2019IQC peut comprendre l\u2019aspect, les dimensions, la masse, la tension \u00e0 vide et la r\u00e9sistance interne. La v\u00e9rification de capacit\u00e9 par \u00e9chantillonnage peut d\u00e9tecter un grade incorrect ou un lot anormal, mais la m\u00e9thode doit pr\u00e9ciser le profil de charge-d\u00e9charge, la temp\u00e9rature, le temps de repos et la tension de r\u00e9f\u00e9rence. Sinon, deux laboratoires peuvent annoncer des valeurs diff\u00e9rentes pour une m\u00eame cellule.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">D\u00e9finissez \u00e9galement les r\u00e8gles de stockage. Les cellules n\u00e9cessitent une plage d\u2019\u00e9tat de charge approuv\u00e9e, des limites de temp\u00e9rature et d\u2019humidit\u00e9, une dur\u00e9e maximale de stockage et une gestion premier entr\u00e9, premier sorti. Les cellules endommag\u00e9es, gonfl\u00e9es, corrod\u00e9es ou profond\u00e9ment d\u00e9charg\u00e9es doivent suivre un processus d\u2019examen s\u00e9par\u00e9, et non retourner dans le stock utilisable apr\u00e8s un simple contr\u00f4le de tension.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les documents de qualification des cellules et les justificatifs de transport ne prouvent pas que tous les lots re\u00e7us sont identiques. V\u00e9rifiez leur correspondance avec le mod\u00e8le approuv\u00e9, puis utilisez les enregistrements de r\u00e9ception et la tra\u00e7abilit\u00e9 de production pour ma\u00eetriser les lots. Consultez le <a href=\"https:\/\/www.yulidapower.com\/fr\/power-bank-battery-cell-selection\/\">guide de s\u00e9lection des cellules pour batteries externes<\/a> pour conna\u00eetre les v\u00e9rifications de conception qui pr\u00e9c\u00e8dent l\u2019IQC.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Que doit v\u00e9rifier l\u2019IQC sur les PCBAs et les composants \u00e9lectroniques ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Commencez par la r\u00e9vision et la liste des composants critiques. Une PCBA peut sembler correcte tout en comportant un autre circuit int\u00e9gr\u00e9 de protection, un MOSFET aux caract\u00e9ristiques nominales inf\u00e9rieures, une autre inductance, un autre condensateur, un autre connecteur ou un param\u00e8tre programm\u00e9 diff\u00e9rent.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les contr\u00f4les \u00e0 r\u00e9ception des PCBAs peuvent comprendre :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>R\u00e9vision de la carte et de l\u2019assemblage.<\/li>\n\n\n\n<li>Marquage ou code de lot requis.<\/li>\n\n\n\n<li>Fabricant et r\u00e9f\u00e9rence des composants critiques.<\/li>\n\n\n\n<li>Polarit\u00e9, orientation et dommages \u00e9vidents des composants.<\/li>\n\n\n\n<li>Joints bras\u00e9s, contamination et qualit\u00e9 de r\u00e9alisation m\u00e9canique.<\/li>\n\n\n\n<li>Version du firmware ou des param\u00e8tres.<\/li>\n\n\n\n<li>Fonctions d\u2019entr\u00e9e, de sortie, de veille et de protection sur un dispositif d\u2019essai convenu.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Si le contrat impose des crit\u00e8res d\u2019acceptation IPC, pr\u00e9cisez le document et sa r\u00e9vision dans l\u2019accord qualit\u00e9. IPC a annonc\u00e9 IPC-A-610J en 2024 comme norme d\u2019acceptation apr\u00e8s assemblage, et IPC J-STD-001J comme norme associ\u00e9e pour les proc\u00e9d\u00e9s et mat\u00e9riaux de brasage. Les deux sont souvent utilis\u00e9es ensemble, mais aucune ne devient automatiquement une exigence contractuelle au seul motif que l\u2019usine conna\u00eet ces documents. <a href=\"https:\/\/www.electronics.org\/news-release\/ipc-releases-j-revisions-two-leading-standards-electronics-assembly\" target=\"_blank\" rel=\"noopener\">IPC : publication d\u2019IPC-A-610J et de J-STD-001J<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">D\u00e9finissez la classe du produit et les \u00e9ventuels crit\u00e8res propres au client avant l\u2019inspection. D\u00e9cidez \u00e9galement comment \u00e9valuer les joints cach\u00e9s. L\u2019inspection visuelle ne permet ni d\u2019observer toutes les interfaces bras\u00e9es ni de v\u00e9rifier un seuil de coupure programm\u00e9.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Que doit ma\u00eetriser l\u2019IPQC sur la ligne d\u2019assemblage ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">L\u2019IPQC doit d\u00e9tecter les d\u00e9rives du proc\u00e9d\u00e9 tant que la quantit\u00e9 concern\u00e9e reste faible. L\u2019inspecteur a besoin d\u2019un plan de r\u00e9action, pas seulement d\u2019un formulaire \u00e0 signer en fin de poste.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les contr\u00f4les IPQC utiles comprennent :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Le d\u00e9gagement et la v\u00e9rification de la ligne avant le lancement d\u2019un nouveau SKU ou d\u2019une nouvelle r\u00e9vision.<\/li>\n\n\n\n<li>La v\u00e9rification des mat\u00e9riaux et composants par rapport \u00e0 l\u2019ordre de fabrication et \u00e0 la nomenclature.<\/li>\n\n\n\n<li>La fabrication et l\u2019approbation de la premi\u00e8re pi\u00e8ce.<\/li>\n\n\n\n<li>L\u2019appairage des cellules et les contr\u00f4les de polarit\u00e9.<\/li>\n\n\n\n<li>Le programme de soudage, l\u2019\u00e9tat des \u00e9lectrodes et la v\u00e9rification p\u00e9riodique des soudures.<\/li>\n\n\n\n<li>La temp\u00e9rature de brasage ou les r\u00e9glages du proc\u00e9d\u00e9, selon le cas.<\/li>\n\n\n\n<li>Le positionnement de l\u2019isolation, du calage, de la NTC et de l\u2019adh\u00e9sif.<\/li>\n\n\n\n<li>La v\u00e9rification de la PCBA et du firmware.<\/li>\n\n\n\n<li>Le couple de serrage des vis, le soudage par ultrasons ou les param\u00e8tres de fermeture du bo\u00eetier, lorsqu\u2019ils sont utilis\u00e9s.<\/li>\n\n\n\n<li>Les contr\u00f4les de charge, de sortie et de consommation de courant en cours de fabrication.<\/li>\n\n\n\n<li>Les mesures de protection ESD et la manipulation des composants \u00e9lectroniques expos\u00e9s.<\/li>\n\n\n\n<li>La s\u00e9paration et l\u2019identification des unit\u00e9s retouch\u00e9es.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La fr\u00e9quence doit refl\u00e9ter le risque et la stabilit\u00e9 du proc\u00e9d\u00e9. Une ligne peut contr\u00f4ler la premi\u00e8re unit\u00e9, puis renouveler le contr\u00f4le chaque heure, apr\u00e8s une quantit\u00e9 d\u00e9finie ou apr\u00e8s un arr\u00eat. Un param\u00e8tre automatis\u00e9 \u00e0 haut risque peut \u00eatre enregistr\u00e9 \u00e0 chaque cycle. Inscrivez la r\u00e8gle dans le plan de contr\u00f4le au lieu de laisser chaque \u00e9quipe l\u2019improviser.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comment ma\u00eetriser le soudage et l\u2019isolation des cellules ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">L\u2019interconnexion des cellules m\u00e9rite un point de contr\u00f4le distinct : une liaison insuffisante peut cr\u00e9er de la r\u00e9sistance et de la chaleur, tandis qu\u2019une \u00e9nergie excessive peut endommager la borne ou la languette de la cellule.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L\u2019instruction de travail doit d\u00e9finir l\u2019empilage des mat\u00e9riaux, l\u2019\u00e9quipement de soudage, la plage de param\u00e8tres approuv\u00e9e, l\u2019entretien des \u00e9lectrodes et la m\u00e9thode d\u2019essai. Selon la conception, la v\u00e9rification peut recourir \u00e0 un essai de pelage, un essai de traction, une mesure de r\u00e9sistance, des crit\u00e8res visuels ou une combinaison de ces m\u00e9thodes. Reliez le r\u00e9sultat \u00e0 la machine, \u00e0 l\u2019heure et au lot de production.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ne laissez pas le contr\u00f4le destructif des soudures devenir un rituel effectu\u00e9 sur une bande sans rapport avec la production en d\u00e9but de semaine. L\u2019\u00e9prouvette, le mat\u00e9riau et le r\u00e9glage doivent repr\u00e9senter suffisamment bien la liaison de production pour fournir des preuves utiles.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les contr\u00f4les d\u2019isolation doivent confirmer le mat\u00e9riau, la position et la couverture. Inspectez les bords des cellules, les languettes, les barres conductrices, le cheminement des fils, les \u00e9l\u00e9ments coupants et la distance entre les pi\u00e8ces conductrices. Assurez-vous que la NTC est en contact avec l\u2019emplacement pr\u00e9vu et ne peut pas bouger pendant l\u2019assemblage du bo\u00eetier.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" src=\"https:\/\/www.yulidapower.com\/wp-content\/uploads\/2026\/09\/power-bank-ipqc-welding-insulation-600x400-1.webp\" alt=\"Inspection du soudage et de l\u2019isolation des cellules sur une ligne de production de batteries externes\"\/><figcaption class=\"wp-element-caption\">Illustration g\u00e9n\u00e9r\u00e9e par IA d\u2019un contr\u00f4le en cours de fabrication portant sur le soudage des cellules, l\u2019isolation et l\u2019assemblage ma\u00eetris\u00e9 des batteries externes.<\/figcaption><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Quand une inspection de premi\u00e8re pi\u00e8ce est-elle n\u00e9cessaire ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Effectuez une inspection de premi\u00e8re pi\u00e8ce au d\u00e9but d\u2019un lot de production et apr\u00e8s toute situation susceptible de modifier le r\u00e9sultat. Il peut s\u2019agir d\u2019un changement de mod\u00e8le ou de lot mati\u00e8re, d\u2019un r\u00e9glage du dispositif de maintien ou d\u2019essai, d\u2019une mise \u00e0 jour du firmware, d\u2019un arr\u00eat prolong\u00e9 de la ligne, d\u2019une maintenance ou d\u2019un changement d\u2019op\u00e9rateur sur un proc\u00e9d\u00e9 manuel ma\u00eetris\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L\u2019inspection de premi\u00e8re pi\u00e8ce doit aller au-del\u00e0 de l\u2019aspect. V\u00e9rifiez l\u2019identification, la configuration de fabrication, les performances \u00e9lectriques de base, le firmware, les \u00e9tiquettes et l\u2019emballage. Pour un mod\u00e8le USB-C \u00e0 forte puissance, confirmez les profils de charge et de sortie annonc\u00e9s \u00e0 l\u2019aide d\u2019un analyseur de protocole et d\u2019une charge \u00e9lectronique.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Gardez la premi\u00e8re unit\u00e9 approuv\u00e9e ou son dossier complet \u00e0 disposition sur la ligne. Si la premi\u00e8re pi\u00e8ce \u00e9choue au contr\u00f4le, arr\u00eatez la production et isolez les unit\u00e9s fabriqu\u00e9es depuis le dernier contr\u00f4le accept\u00e9. Signer le formulaire une fois la production termin\u00e9e lui fait perdre l\u2019essentiel de son int\u00e9r\u00eat.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Quels essais chaque batterie externe termin\u00e9e doit-elle r\u00e9ussir ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Chaque unit\u00e9 doit r\u00e9ussir un essai de fin de ligne adapt\u00e9 aux d\u00e9fauts fr\u00e9quents, d\u00e9tectables et importants. Le dispositif d\u2019essai doit identifier le programme par SKU et emp\u00eacher l\u2019op\u00e9rateur d\u2019en utiliser un moins exigeant.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Une s\u00e9quence de fin de ligne appliqu\u00e9e \u00e0 100% des unit\u00e9s peut couvrir :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>La charge en entr\u00e9e sur le ou les ports requis.<\/li>\n\n\n\n<li>La tension et le courant de sortie \u00e0 des points de charge d\u00e9finis.<\/li>\n\n\n\n<li>Les profils fixes USB-A et USB-C requis.<\/li>\n\n\n\n<li>La n\u00e9gociation USB Power Delivery ou PPS lorsque ces fonctions sont annonc\u00e9es.<\/li>\n\n\n\n<li>Le comportement multiport pour les combinaisons retenues dans la sp\u00e9cification.<\/li>\n\n\n\n<li>Le bouton, l\u2019\u00e9cran, les indicateurs et le mode faible courant.<\/li>\n\n\n\n<li>Le courant de veille ou une d\u00e9charge anormale.<\/li>\n\n\n\n<li>Un contr\u00f4le de base de la protection contre les surintensit\u00e9s ou les courts-circuits, au moyen d\u2019un dispositif s\u00fbr et valid\u00e9.<\/li>\n\n\n\n<li>Le fonctionnement des c\u00e2bles int\u00e9gr\u00e9s et des connecteurs.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Enregistrez les valeurs mesur\u00e9es lorsque l\u2019\u00e9quipement le permet. Un voyant vert seul n\u2019indique pas si le r\u00e9sultat \u00e9tait proche de la limite, ni si un poste a fait \u00e9chouer puis r\u00e9ussir plusieurs fois la m\u00eame unit\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les essais de fin de ligne doivent rester dans le cadre de la m\u00e9thode de production ma\u00eetris\u00e9e. Les essais destructifs en conditions abusives rel\u00e8vent d\u2019un programme de s\u00e9curit\u00e9 qualifi\u00e9, et non d\u2019une ligne d\u2019assemblage ouverte. UL indique que les essais de batteries externes selon UL 2056 couvrent la protection contre la surcharge et la d\u00e9charge excessive, les courts-circuits, la surcharge \u00e9lectrique, les chutes, les chocs et la s\u00e9curit\u00e9 thermique. Ces \u00e9valuations ont un autre objectif que les contr\u00f4les fonctionnels courants en usine. <a href=\"https:\/\/www.ul.com\/insights\/enhance-safety-power-banks-ul-2056-testing\" target=\"_blank\" rel=\"noopener\">UL Solutions : essais des batteries externes selon UL 2056<\/a>.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" src=\"https:\/\/www.yulidapower.com\/wp-content\/uploads\/2026\/09\/power-bank-end-of-line-testing-600x400-1.webp\" alt=\"Essais fonctionnels de fin de ligne des batteries externes USB-C termin\u00e9es\"\/><figcaption class=\"wp-element-caption\">Illustration g\u00e9n\u00e9r\u00e9e par IA d\u2019essais \u00e9lectriques et fonctionnels USB-C sur plusieurs postes de fin de ligne.<\/figcaption><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Que doit inspecter l\u2019OQC avant l\u2019exp\u00e9dition ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">L\u2019OQC doit inspecter un \u00e9chantillon s\u00e9lectionn\u00e9 al\u00e9atoirement dans un lot termin\u00e9 clairement d\u00e9fini. L\u2019\u00e9chantillon doit repr\u00e9senter tous les cartons, les p\u00e9riodes de production, les couleurs et les autres variantes du lot. Choisir les cartons les plus propres en haut des piles pr\u00e8s de la table d\u2019inspection ne constitue pas un \u00e9chantillonnage al\u00e9atoire.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La liste de contr\u00f4le avant exp\u00e9dition peut comprendre :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>SKU, couleur, quantit\u00e9 et plage de cartons.<\/li>\n\n\n\n<li>Configuration de fabrication du produit et comparaison avec l\u2019\u00e9chantillon approuv\u00e9.<\/li>\n\n\n\n<li>Qualit\u00e9 de r\u00e9alisation, ajustement, finition, ports, boutons et accessoires.<\/li>\n\n\n\n<li>Valeurs nominales sur les \u00e9tiquettes, avertissements, code-barres et num\u00e9ro de s\u00e9rie ou code de lot.<\/li>\n\n\n\n<li>Emballage, composition des assortiments, marquages des cartons et protection pour le transport.<\/li>\n\n\n\n<li>Dimensions du produit, masse et mesures \u00e9lectriques s\u00e9lectionn\u00e9es.<\/li>\n\n\n\n<li>Fonctionnement de la charge, de la sortie, des protocoles, des indicateurs et des c\u00e2bles.<\/li>\n\n\n\n<li>Essais par \u00e9chantillonnage de capacit\u00e9, de puissance de sortie soutenue, de temp\u00e9rature ou de vieillissement, si requis.<\/li>\n\n\n\n<li>Examen des enregistrements IQC, IPQC, des r\u00e9sultats de fin de ligne et des non-conformit\u00e9s non cl\u00f4tur\u00e9es.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Des essais diff\u00e9rents peuvent n\u00e9cessiter des tailles d\u2019\u00e9chantillon diff\u00e9rentes. Une inspection visuelle non destructive peut utiliser un plan d\u2019acceptation de lot, tandis qu\u2019un essai de capacit\u00e9 long peut porter sur un \u00e9chantillon technique plus petit, d\u00e9fini dans la sp\u00e9cification d\u2019achat. Les exigences critiques pour la s\u00e9curit\u00e9 peuvent n\u00e9cessiter une qualification distincte, une v\u00e9rification p\u00e9riodique ou des r\u00e8gles d\u2019acceptation z\u00e9ro.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u2019est-ce que l\u2019AQL dans l\u2019inspection des batteries externes ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">L\u2019AQL est un indice utilis\u00e9 pour s\u00e9lectionner un syst\u00e8me d\u2019\u00e9chantillonnage pour acceptation sur une s\u00e9rie continue de lots. Il contribue \u00e0 d\u00e9terminer la taille de l\u2019\u00e9chantillon et le nombre d\u2019acceptation ou de rejet pour une inspection d\u00e9finie. Il n\u2019autorise pas l\u2019exp\u00e9dition de ce pourcentage d\u2019unit\u00e9s dont on sait qu\u2019elles sont d\u00e9fectueuses.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le NIST explique clairement le point essentiel : l\u2019\u00e9chantillonnage pour acceptation sert \u00e0 d\u00e9cider si un lot est susceptible d\u2019\u00eatre acceptable, pas \u00e0 estimer la qualit\u00e9 du lot. <a href=\"https:\/\/www.itl.nist.gov\/div898\/handbook\/pmc\/section2\/pmc21.htm\" target=\"_blank\" rel=\"noopener\">NIST : qu\u2019est-ce que l\u2019\u00e9chantillonnage pour acceptation ?<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La r\u00e9f\u00e9rence internationale actuelle est ISO 2859-1:2026, publi\u00e9e en janvier 2026. L\u2019ISO indique que cette troisi\u00e8me \u00e9dition d\u00e9finit des syst\u00e8mes d\u2019\u00e9chantillonnage simple, double et multiple index\u00e9s sur l\u2019AQL, comprend les proc\u00e9dures de changement de s\u00e9v\u00e9rit\u00e9 et de contr\u00f4le \u00e0 lots intermittents, et remplace l\u2019\u00e9dition de 1999 et ses amendements. <a href=\"https:\/\/www.iso.org\/standard\/2859-1\" target=\"_blank\" rel=\"noopener\">ISO: ISO 2859-1:2026<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Si un contrat mentionne encore ISO 2859-1:1999, les parties doivent examiner la transition plut\u00f4t que d\u2019appliquer une autre table sans le pr\u00e9ciser. Indiquez la norme, l\u2019\u00e9dition, le niveau d\u2019inspection, le type d\u2019\u00e9chantillonnage, l\u2019AQL, l\u2019\u00e9tat de s\u00e9v\u00e9rit\u00e9 du contr\u00f4le et la d\u00e9finition du lot dans l\u2019instruction d\u2019inspection.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Un AQL de 1.0 signifie-t-il que 1% de produits d\u00e9fectueux sont acceptables ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Non. Une valeur AQL sert \u00e0 indexer un syst\u00e8me d\u2019\u00e9chantillonnage et ses caract\u00e9ristiques d\u2019efficacit\u00e9 sur une s\u00e9rie continue de lots. Elle n\u2019autorise pas l\u2019inspecteur \u00e0 constater puis \u00e0 ignorer une proportion connue de 1% d\u2019unit\u00e9s d\u00e9fectueuses dans l\u2019exp\u00e9dition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un plan d\u2019\u00e9chantillonnage cr\u00e9e des risques pour le fournisseur et le client. Un bon lot peut \u00eatre rejet\u00e9 et un mauvais lot accept\u00e9, puisque la d\u00e9cision repose sur un \u00e9chantillon. Le NIST d\u00e9crit ces risques \u00e0 travers la courbe d\u2019efficacit\u00e9 et distingue l\u2019AQL du pourcentage limite d\u2019unit\u00e9s d\u00e9fectueuses dans un lot. <a href=\"https:\/\/www.itl.nist.gov\/div898\/handbook\/pmc\/section2\/pmc22.htm\" target=\"_blank\" rel=\"noopener\">NIST : types de plans d\u2019\u00e9chantillonnage pour acceptation des lots<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">C\u2019est pourquoi l\u2019acheteur ne doit pas \u00e9crire \u00ab AQL 2.5 \u00bb comme seule exigence d\u2019inspection. L\u2019instruction doit aussi pr\u00e9ciser la classe de d\u00e9faut, le niveau d\u2019inspection, le syst\u00e8me d\u2019\u00e9chantillonnage, les r\u00e8gles de changement de s\u00e9v\u00e9rit\u00e9 ainsi que les nombres d\u2019acceptation et de rejet issus de la norme choisie.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comment classer les d\u00e9fauts ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Classez les d\u00e9fauts probables avant que l\u2019inspecteur n\u2019ouvre le premier carton. Les d\u00e9finitions doivent d\u00e9crire les cons\u00e9quences, et la liste de contr\u00f4le doit donner des exemples propres au produit.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Classe de d\u00e9faut<\/th><th>Signification pratique<\/th><th>Exemples possibles pour les batteries externes<\/th><\/tr><\/thead><tbody><tr><td>Critique<\/td><td>Peut cr\u00e9er un risque inacceptable pour la s\u00e9curit\u00e9 ou la conformit\u00e9 r\u00e9glementaire, ou enfreint une exigence consid\u00e9r\u00e9e comme critique par le contrat<\/td><td>Cellule incorrecte ou non approuv\u00e9e, polarit\u00e9 invers\u00e9e, pi\u00e8ce conductrice expos\u00e9e, isolation essentielle absente, d\u00e9faillance dangereuse d\u2019une protection, valeur nominale obligatoire substantiellement fausse ou condition de transport interdite<\/td><\/tr><tr><td>Majeur<\/td><td>Emp\u00eache l\u2019usage pr\u00e9vu, r\u00e9duit sensiblement les performances ou risque d\u2019entra\u00eener un retour<\/td><td>Unit\u00e9 qui ne se charge pas, profil PD requis absent, capacit\u00e9 inf\u00e9rieure \u00e0 la limite convenue, c\u00e2ble int\u00e9gr\u00e9 intermittent, jeu important du bo\u00eetier, accessoire incorrect ou code de tra\u00e7abilit\u00e9 illisible<\/td><\/tr><tr><td>Mineur<\/td><td>N\u2019affecte pas sensiblement la s\u00e9curit\u00e9 du fonctionnement, mais d\u00e9passe la limite approuv\u00e9e de qualit\u00e9 de r\u00e9alisation ou d\u2019aspect<\/td><td>Petite marque de surface en dehors de l\u2019emplacement autoris\u00e9, l\u00e9ger d\u00e9faut d\u2019impression avec un texte enti\u00e8rement lisible, faible variation de couleur au-del\u00e0 de la plage approuv\u00e9e<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Ces exemples sont des points de d\u00e9part, pas des classifications universelles. Un probl\u00e8me de marquage peut \u00eatre critique sur un march\u00e9 et majeur sur un autre. Un d\u00e9faut esth\u00e9tique peut \u00eatre majeur pour une gamme haut de gamme destin\u00e9e au commerce de d\u00e9tail, avec des exigences d\u2019aspect strictes. Convenez de la liste et des photographies avant la production.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pour les d\u00e9fauts critiques, de nombreux acheteurs imposent une acceptation z\u00e9ro ou une r\u00e8gle distincte c=0, suivie de mesures de confinement et d\u2019une investigation si un d\u00e9faut est d\u00e9tect\u00e9. Ne classez pas un d\u00e9faut de s\u00e9curit\u00e9 dans un AQL courant de d\u00e9fauts majeurs simplement parce que la table est pratique.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comment s\u00e9lectionner un plan d\u2019\u00e9chantillonnage AQL ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Utilisez la norme \u00e0 jour sous licence et suivez ses tables ainsi que ses r\u00e8gles de changement de s\u00e9v\u00e9rit\u00e9. La d\u00e9marche habituelle est la suivante :<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>D\u00e9finir un lot homog\u00e8ne : SKU exact, r\u00e9vision, p\u00e9riode de production et quantit\u00e9.<\/li>\n\n\n\n<li>Choisir la norme d\u2019inspection et son \u00e9dition.<\/li>\n\n\n\n<li>S\u00e9lectionner le niveau d\u2019inspection ou le niveau sp\u00e9cial adapt\u00e9 \u00e0 la caract\u00e9ristique.<\/li>\n\n\n\n<li>Attribuer l\u2019AQL convenu ou une autre r\u00e8gle de d\u00e9cision sur le lot \u00e0 chaque classe de d\u00e9faut.<\/li>\n\n\n\n<li>Utiliser la taille du lot et le niveau pour obtenir la lettre-code de taille d\u2019\u00e9chantillon.<\/li>\n\n\n\n<li>Utiliser le plan simple, double ou multiple choisi pour obtenir la taille d\u2019\u00e9chantillon et les nombres d\u2019acceptation et de rejet.<\/li>\n\n\n\n<li>S\u00e9lectionner les unit\u00e9s al\u00e9atoirement dans l\u2019ensemble du lot.<\/li>\n\n\n\n<li>Enregistrer chaque d\u00e9faut et d\u00e9cider du sort du lot sans modifier le plan apr\u00e8s avoir vu les r\u00e9sultats.<\/li>\n\n\n\n<li>Appliquer, d\u2019un lot au suivant, les r\u00e8gles de contr\u00f4le normal, renforc\u00e9, r\u00e9duit, \u00e0 lots intermittents ou d\u2019interruption pr\u00e9vues par la norme lorsque l\u2019accord y fait appel.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Ne copiez pas une ancienne table de tailles d\u2019\u00e9chantillon trouv\u00e9e sur un blog d\u2019inspection en la pr\u00e9sentant comme ISO 2859-1:2026. L\u2019\u00e9dition 2026 a remplac\u00e9 la pr\u00e9c\u00e9dente. L\u2019accord qualit\u00e9 doit identifier la table r\u00e9ellement utilis\u00e9e.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">ANSI\/ASQ Z1.4 est une autre norme d\u2019\u00e9chantillonnage par attributs utilis\u00e9e dans certaines cha\u00eenes d\u2019approvisionnement. L\u2019ASQ d\u00e9crit Z1.4 comme proposant des plans normaux, renforc\u00e9s et r\u00e9duits pour un AQL donn\u00e9. Si l\u2019acheteur l\u2019utilise, mentionnez-la explicitement au lieu de consid\u00e9rer toutes les tables AQL comme interchangeables. <a href=\"https:\/\/asq.org\/quality-resources\/z14-z19\" target=\"_blank\" rel=\"noopener\">ASQ : normes d\u2019\u00e9chantillonnage Z1.4 et Z1.9<\/a>.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" src=\"https:\/\/www.yulidapower.com\/wp-content\/uploads\/2026\/09\/power-bank-oqc-aql-inspection-600x400-1.webp\" alt=\"Inspection al\u00e9atoire avant exp\u00e9dition de batteries externes emball\u00e9es selon un plan d\u2019\u00e9chantillonnage AQL\"\/><figcaption class=\"wp-element-caption\">Illustration g\u00e9n\u00e9r\u00e9e par IA d\u2019une inspection al\u00e9atoire avant exp\u00e9dition, r\u00e9partie sur les cartons termin\u00e9s selon un plan d\u2019\u00e9chantillonnage d\u00e9fini.<\/figcaption><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Quel AQL un acheteur OEM doit-il utiliser pour les batteries externes ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Il n\u2019existe pas d\u2019AQL universel adapt\u00e9 \u00e0 toutes les batteries externes ou \u00e0 toutes les classes de d\u00e9fauts. Choisissez le plan selon les risques du produit, les exigences du march\u00e9, la tol\u00e9rance de la marque, l\u2019historique du proc\u00e9d\u00e9 et les cons\u00e9quences d\u2019un d\u00e9faut non d\u00e9tect\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un acheteur peut fixer des r\u00e8gles plus strictes pour la s\u00e9curit\u00e9, les fonctions \u00e9lectriques essentielles et les \u00e9tiquettes obligatoires que pour de petites marques esth\u00e9tiques. Les valeurs effectives doivent figurer dans l\u2019accord qualit\u00e9. Les valeurs commerciales souvent cit\u00e9es, telles que 1.0, 1.5, 2.5 ou 4.0, ne constituent pas des recommandations automatiques et ne doivent pas \u00eatre reprises sans examiner la courbe d\u2019efficacit\u00e9 et les risques du plan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Certaines caract\u00e9ristiques se ma\u00eetrisent mieux autrement :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Utilisez des essais automatis\u00e9s \u00e0 100% pour la polarit\u00e9, la charge de base, la sortie et l\u2019identification programm\u00e9e lorsque l\u2019essai est fiable et non destructif.<\/li>\n\n\n\n<li>Utilisez la surveillance du proc\u00e9d\u00e9 pour l\u2019\u00e9nergie de soudage, le couple, la programmation du firmware et les autres param\u00e8tres de fabrication.<\/li>\n\n\n\n<li>Utilisez la qualification et les essais p\u00e9riodiques de fiabilit\u00e9 pour les conditions abusives, la dur\u00e9e de vie en cycles et les autres \u00e9valuations longues ou destructives.<\/li>\n\n\n\n<li>Utilisez une r\u00e8gle distincte d\u2019acceptation z\u00e9ro ou de confinement pour les d\u00e9fauts critiques convenus.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">L\u2019AQL est un outil de d\u00e9cision sur les lots. Ce n\u2019est pas l\u2019ensemble du syst\u00e8me qualit\u00e9.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">L\u2019\u00e9chantillonnage final peut-il remplacer la ma\u00eetrise du proc\u00e9d\u00e9 ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Non. Un \u00e9chantillon final peut r\u00e9v\u00e9ler un probl\u00e8me, mais il indique rarement \u00e0 l\u2019usine quand celui-ci a commenc\u00e9 ou quelles unit\u00e9s sont concern\u00e9es.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Supposons qu\u2019un \u00e9chantillon OQC r\u00e9v\u00e8le une batterie externe dont la sortie USB-C est intermittente. L\u2019inspection finale peut rejeter le lot. Elle ne peut pas d\u00e9terminer si la cause est un dispositif de brasage us\u00e9 pendant la derni\u00e8re heure, un lot de connecteurs re\u00e7us, une contamination sur une ligne, un lot de firmware incorrect ou des retouches r\u00e9p\u00e9t\u00e9es. La r\u00e9ponse vient de la tra\u00e7abilit\u00e9 des composants et des enregistrements du proc\u00e9d\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Utilisez les tendances avant l\u2019inspection finale. Surveillez le taux de r\u00e9ussite au premier passage, les codes de d\u00e9faillance des postes, le taux de retouche, les r\u00e9sultats de soudage, la distribution du courant de veille et les r\u00e9sultats des essais de capacit\u00e9. Un lot peut r\u00e9ussir un contr\u00f4le AQL alors que le proc\u00e9d\u00e9 se d\u00e9grade.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comment g\u00e9rer les essais de performance par \u00e9chantillonnage ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Les essais de capacit\u00e9, de puissance soutenue, de temp\u00e9rature et de dur\u00e9e de vie en cycles n\u00e9cessitent des conditions ma\u00eetris\u00e9es et un calendrier diff\u00e9rent de celui d\u2019une inspection visuelle rapide.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pour chaque essai par \u00e9chantillonnage, pr\u00e9cisez :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>La fr\u00e9quence de pr\u00e9l\u00e8vement et l\u2019origine des \u00e9chantillons.<\/li>\n\n\n\n<li>L\u2019identification des \u00e9chantillons et leur conditionnement pr\u00e9alable.<\/li>\n\n\n\n<li>Le chargeur, le c\u00e2ble, la charge et le profil de protocole.<\/li>\n\n\n\n<li>Les conditions ambiantes et le temps de repos.<\/li>\n\n\n\n<li>L\u2019\u00e9quipement de mesure et son statut d\u2019\u00e9talonnage.<\/li>\n\n\n\n<li>Les r\u00e8gles de coupure en charge et en d\u00e9charge.<\/li>\n\n\n\n<li>La tension de r\u00e9f\u00e9rence utilis\u00e9e pour les valeurs annonc\u00e9es en mAh.<\/li>\n\n\n\n<li>Les limites d\u2019acceptation et le traitement de l\u2019incertitude de mesure.<\/li>\n\n\n\n<li>Les r\u00e8gles de nouvel essai et de remont\u00e9e des d\u00e9faillances.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Ne remplacez pas un \u00e9chantillon apr\u00e8s un \u00e9chec, sauf si la m\u00e9thode \u00e9crite l\u2019autorise et si le premier r\u00e9sultat reste enregistr\u00e9. Un nouvel essai peut servir \u00e0 \u00e9tudier la r\u00e9p\u00e9tabilit\u00e9 ; il ne doit pas effacer les preuves.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pour les m\u00e9thodes d\u00e9taill\u00e9es, consultez les guides YULIDA sur les <a href=\"https:\/\/www.yulidapower.com\/fr\/power-bank-capacity-testing\/\">essais de capacit\u00e9 des batteries externes<\/a>, <a href=\"https:\/\/www.yulidapower.com\/fr\/duree-de-vie-en-cycles-de-charge-dune-batterie-externe\/\">essais de dur\u00e9e de vie en cycles<\/a> et <a href=\"https:\/\/www.yulidapower.com\/fr\/comment-tester-la-charge-rapide-dune-batterie-externe\/\">essais de charge rapide<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Que se passe-t-il lorsqu\u2019un lot \u00e9choue \u00e0 l\u2019OQC ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Mettez le lot en quarantaine et ouvrez un enregistrement de non-conformit\u00e9. Celui-ci doit identifier le SKU, le lot de production, la plage de cartons, l\u2019\u00e9chantillon en \u00e9chec, le d\u00e9faut, la quantit\u00e9 inspect\u00e9e et la r\u00e8gle d\u2019acceptation applicable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">D\u00e9cidez ensuite du traitement :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Rejeter le lot et le fabriquer \u00e0 nouveau.<\/li>\n\n\n\n<li>Effectuer un tri valid\u00e9 \u00e0 100% pour un d\u00e9faut d\u00e9tectable.<\/li>\n\n\n\n<li>Retoucher selon une instruction approuv\u00e9e, puis r\u00e9p\u00e9ter les essais requis.<\/li>\n\n\n\n<li>Autoriser l\u2019utilisation en l\u2019\u00e9tat uniquement avec l\u2019accord \u00e9crit de la partie responsable de l\u2019exigence, et seulement si les obligations de s\u00e9curit\u00e9 et r\u00e9glementaires le permettent.<\/li>\n\n\n\n<li>Mettre au rebut ou ma\u00eetriser autrement les unit\u00e9s qui ne peuvent pas \u00eatre rendues conformes.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">D\u00e9terminez le p\u00e9rim\u00e8tre affect\u00e9 avant la lib\u00e9ration. Exploitez les donn\u00e9es des postes, les lots de composants, les horaires de la ligne, l\u2019op\u00e9rateur, la machine et l\u2019historique des retouches. Si le d\u00e9faut peut \u00e9chapper \u00e0 la m\u00e9thode de tri propos\u00e9e, m\u00eame un tri \u00e0 100% peut rester insuffisant.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ne pr\u00e9levez pas sans cesse de nouveaux \u00e9chantillons dans le m\u00eame lot refus\u00e9 jusqu\u2019\u00e0 ce que l\u2019un d\u2019eux r\u00e9ussisse. La r\u00e9inspection doit suivre la norme et la proc\u00e9dure qualit\u00e9 convenues apr\u00e8s le confinement ou l\u2019action corrective. Conservez l\u2019\u00e9chec initial dans le rapport final.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comment ma\u00eetriser les retouches ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Une retouche modifie le produit et peut provoquer de nouveaux dommages. Utilisez une instruction ma\u00eetris\u00e9e pr\u00e9cisant qui peut l\u2019effectuer, les outils et mat\u00e9riaux autoris\u00e9s, le nombre de cycles de retouche permis et les inspections \u00e0 r\u00e9p\u00e9ter.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sur une batterie externe, l\u2019ouverture du bo\u00eetier peut affecter les clips, l\u2019adh\u00e9sif, l\u2019isolation, les cellules, les c\u00e2bles et les surfaces esth\u00e9tiques. Une reprise de brasage peut exposer les cellules \u00e0 la chaleur ou laisser une contamination. La reprogrammation du firmware peut modifier la charge, la r\u00e9partition de puissance et le comportement des protections.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Identifiez les unit\u00e9s retouch\u00e9es dans les enregistrements de production, m\u00eame si le client ne souhaite pas de marque ext\u00e9rieure visible. Apr\u00e8s la retouche, r\u00e9p\u00e9tez chaque contr\u00f4le affect\u00e9 par l\u2019op\u00e9ration. Le remplacement d\u2019une PCBA, par exemple, exige g\u00e9n\u00e9ralement une v\u00e9rification du firmware et des essais \u00e9lectriques fonctionnels complets.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comment g\u00e9rer les modifications techniques ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Aucune substitution touchant \u00e0 la s\u00e9curit\u00e9 ou aux performances ne doit \u00eatre introduite en production par une note manuscrite sur la ligne. Le fournisseur doit \u00e9mettre une demande de modification identifiant les anciennes et nouvelles pi\u00e8ces, le motif, les mod\u00e8les concern\u00e9s, l\u2019analyse des risques, les preuves de validation et le lot propos\u00e9 pour l\u2019entr\u00e9e en application.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Examinez les modifications concernant :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Les cellules et leur source de fabrication.<\/li>\n\n\n\n<li>Les composants de protection, de charge et de conversion.<\/li>\n\n\n\n<li>Le firmware et les fichiers de param\u00e8tres.<\/li>\n\n\n\n<li>La NTC, l\u2019isolation et les mat\u00e9riaux thermiques.<\/li>\n\n\n\n<li>Les connecteurs, c\u00e2bles et conducteurs \u00e0 fort courant.<\/li>\n\n\n\n<li>La r\u00e9sine, l\u2019\u00e9paisseur, l\u2019outillage ou la m\u00e9thode de fermeture du bo\u00eetier.<\/li>\n\n\n\n<li>Les \u00e9tiquettes, valeurs nominales et instructions propres au march\u00e9.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">D\u00e9terminez si la modification n\u00e9cessite un nouvel \u00e9chantillon, une v\u00e9rification partielle, des essais de fiabilit\u00e9, un examen de conformit\u00e9 ou une requalification compl\u00e8te. Le premier lot de production apr\u00e8s approbation doit \u00eatre soumis au niveau d\u2019inspection et \u00e0 la surveillance d\u00e9finis dans le plan de modification.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Quels enregistrements qualit\u00e9 un acheteur OEM doit-il demander ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">L\u2019acheteur n\u2019a pas besoin de tous les formulaires de l\u2019usine, mais les preuves doivent suffire \u00e0 retracer les unit\u00e9s exp\u00e9di\u00e9es et \u00e0 examiner les d\u00e9cisions importantes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Demandez ou conservez :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>La sp\u00e9cification, les plans et la nomenclature approuv\u00e9s, ainsi que l\u2019historique des r\u00e9visions.<\/li>\n\n\n\n<li>L\u2019approbation de l\u2019\u00e9chantillon de r\u00e9f\u00e9rence et les \u00e9chantillons limites sign\u00e9s.<\/li>\n\n\n\n<li>Les enregistrements d\u2019inspection \u00e0 r\u00e9ception des cellules et des autres mat\u00e9riaux ou composants critiques.<\/li>\n\n\n\n<li>La tra\u00e7abilit\u00e9 du lot de cellules jusqu\u2019au lot de produits finis.<\/li>\n\n\n\n<li>Les enregistrements de premi\u00e8re pi\u00e8ce et de v\u00e9rification du d\u00e9gagement de ligne.<\/li>\n\n\n\n<li>Les param\u00e8tres de proc\u00e9d\u00e9 ma\u00eetris\u00e9s et les r\u00e9sultats des v\u00e9rifications p\u00e9riodiques.<\/li>\n\n\n\n<li>Les donn\u00e9es des essais de fin de ligne et le r\u00e9capitulatif des codes de d\u00e9faillance.<\/li>\n\n\n\n<li>Le rapport OQC avec les identifiants des \u00e9chantillons al\u00e9atoires, les d\u00e9fauts et la d\u00e9cision sur le lot.<\/li>\n\n\n\n<li>Les rapports de capacit\u00e9, de charge soutenue, de temp\u00e9rature et de fiabilit\u00e9 exig\u00e9s par le contrat.<\/li>\n\n\n\n<li>Les enregistrements de non-conformit\u00e9, de retouche et d\u2019action corrective.<\/li>\n\n\n\n<li>Les avis de modification approuv\u00e9s.<\/li>\n\n\n\n<li>Le statut d\u2019\u00e9talonnage et d\u2019entretien des dispositifs d\u2019essai pour les \u00e9quipements concern\u00e9s.<\/li>\n\n\n\n<li>La quantit\u00e9 exp\u00e9di\u00e9e, la plage de cartons et l\u2019autorisation de lib\u00e9ration.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Les enregistrements \u00e9lectroniques doivent conserver les r\u00e9sultats initiaux, les nouveaux essais et les modifications. Un tableur ne contenant que des mentions \u00ab CONFORME \u00bb saisies manuellement est difficile \u00e0 auditer. Les exports bruts des postes et les mesures horodat\u00e9es constituent des preuves plus solides lorsque l\u2019\u00e9quipement les permet.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Que doit auditer un acheteur OEM \u00e0 l\u2019usine ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Suivez un SKU depuis la r\u00e9ception jusqu\u2019au carton scell\u00e9. Choisissez un lot r\u00e9el de cellules, retrouvez son enregistrement de r\u00e9ception, localisez-le dans la production en cours et suivez sa trace dans les produits finis. Choisissez ensuite un num\u00e9ro de s\u00e9rie de produit fini et remontez la cha\u00eene en sens inverse.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pendant l\u2019audit, v\u00e9rifiez :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Si les mat\u00e9riaux et composants en quarantaine sont physiquement s\u00e9par\u00e9s de ceux qui sont lib\u00e9r\u00e9s.<\/li>\n\n\n\n<li>Si le programme de la ligne et le dispositif d\u2019essai correspondent au SKU.<\/li>\n\n\n\n<li>Si les op\u00e9rateurs savent identifier l\u2019instruction de travail en vigueur.<\/li>\n\n\n\n<li>Si l\u2019approbation de la premi\u00e8re pi\u00e8ce pr\u00e9c\u00e8de la production en volume.<\/li>\n\n\n\n<li>Si les unit\u00e9s en \u00e9chec sont bloqu\u00e9es pour \u00e9viter leur emballage accidentel.<\/li>\n\n\n\n<li>Si les limites d\u2019essai sont ma\u00eetris\u00e9es et les modifications enregistr\u00e9es.<\/li>\n\n\n\n<li>Si les \u00e9chantillons al\u00e9atoires OQC proviennent de l\u2019ensemble du lot.<\/li>\n\n\n\n<li>Si les lots rejet\u00e9s conservent leurs enregistrements d\u2019\u00e9chec initiaux.<\/li>\n\n\n\n<li>Si les substitutions de composants n\u00e9cessitent une approbation \u00e9crite.<\/li>\n\n\n\n<li>Si les r\u00e9clamations r\u00e9centes sous garantie peuvent \u00eatre reli\u00e9es \u00e0 des SKU et \u00e0 des lots de production exacts.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Demandez \u00e0 l\u2019inspecteur de montrer le traitement d\u2019un cas de d\u00e9faillance. Un syst\u00e8me qualit\u00e9 est plus facile \u00e0 \u00e9valuer lorsqu\u2019un probl\u00e8me survient que lorsque tous les exemples ont \u00e9t\u00e9 pr\u00e9par\u00e9s pour r\u00e9ussir.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Erreurs fr\u00e9quentes dans le contr\u00f4le qualit\u00e9 des batteries externes<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Utiliser une seule liste de contr\u00f4le pour tous les mod\u00e8les<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Une batterie externe promotionnelle de 10 W, un mod\u00e8le USB-C de 65 W pour ordinateur portable et un produit \u00e0 c\u00e2ble int\u00e9gr\u00e9 pr\u00e9sentent des chemins de courant, des interfaces et des modes de d\u00e9faillance diff\u00e9rents. Conservez un plan ma\u00eetris\u00e9 pour chaque configuration de fabrication.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Assimiler un certificat fournisseur \u00e0 une inspection \u00e0 r\u00e9ception<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Les documents aident \u00e0 confirmer l\u2019identification et la qualification. Ils ne v\u00e9rifient pas que le lot livr\u00e9 est correctement \u00e9tiquet\u00e9, intact et conforme aux limites de r\u00e9ception convenues.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Inspecter uniquement l\u2019aspect lors de l\u2019OQC<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Un bo\u00eetier propre peut cacher une faible capacit\u00e9, une consommation de veille \u00e9lev\u00e9e, un profil PD incorrect ou une cellule non approuv\u00e9e. Int\u00e9grez des contr\u00f4les \u00e9lectriques mesurables.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Appliquer l\u2019AQL \u00e0 tous les probl\u00e8mes de s\u00e9curit\u00e9<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Certains dangers n\u00e9cessitent une qualification, une pr\u00e9vention par le proc\u00e9d\u00e9, des contr\u00f4les \u00e0 100% ou des r\u00e8gles d\u2019acceptation z\u00e9ro. Un AQL g\u00e9n\u00e9ral pour d\u00e9fauts majeurs ne constitue pas un raccourci pour ma\u00eetriser la s\u00e9curit\u00e9.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">M\u00e9langer les lots avant d\u2019enregistrer la tra\u00e7abilit\u00e9<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Lorsque des lots de cellules ou de PCBAs sont m\u00e9lang\u00e9s sans enregistrement, le p\u00e9rim\u00e8tre de confinement s\u2019\u00e9tend. Un probl\u00e8me apparu dans un seul lot re\u00e7u peut imposer le blocage de tout l\u2019ordre de fabrication.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Autoriser un nombre illimit\u00e9 de nouveaux essais<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">R\u00e9p\u00e9ter les essais jusqu\u2019\u00e0 ce qu\u2019une unit\u00e9 r\u00e9ussisse masque les d\u00e9fauts intermittents. D\u00e9finissez les conditions de nouvel essai, enregistrez chaque tentative et recherchez les causes des \u00e9checs r\u00e9p\u00e9t\u00e9s.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">R\u00e9\u00e9chantillonner un lot refus\u00e9 sans action corrective<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Un nouvel \u00e9chantillon ne change pas les preuves initiales. Isolez le lot, d\u00e9terminez son traitement et suivez la proc\u00e9dure de r\u00e9inspection convenue.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Questions fr\u00e9quentes<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">1. Que signifient IQC, IPQC et OQC ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">IQC d\u00e9signe le contr\u00f4le qualit\u00e9 \u00e0 r\u00e9ception, IPQC le contr\u00f4le qualit\u00e9 en cours de fabrication et OQC le contr\u00f4le qualit\u00e9 avant exp\u00e9dition. L\u2019IQC ma\u00eetrise les mat\u00e9riaux et composants re\u00e7us, l\u2019IPQC ma\u00eetrise le proc\u00e9d\u00e9 de production et l\u2019OQC prend la d\u00e9cision finale sur le lot \u00e0 exp\u00e9dier.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Le FQC est-il identique \u00e0 l\u2019OQC ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pas toujours. Certaines usines utilisent le FQC pour les contr\u00f4les des unit\u00e9s termin\u00e9es et l\u2019OQC pour l\u2019inspection ind\u00e9pendante de lib\u00e9ration apr\u00e8s emballage. D\u00e9finissez les responsabilit\u00e9s et le p\u00e9rim\u00e8tre de l\u2019inspection dans le plan qualit\u00e9.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Un AQL de 2.5 autorise-t-il 2.5% de batteries externes d\u00e9fectueuses dans une exp\u00e9dition ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Non. L\u2019AQL est un indice utilis\u00e9 avec un syst\u00e8me d\u2019\u00e9chantillonnage. Le r\u00e9sultat de l\u2019\u00e9chantillon d\u00e9termine l\u2019acceptation ou le rejet du lot ; il n\u2019autorise pas l\u2019exp\u00e9dition d\u2019un pourcentage connu d\u2019unit\u00e9s d\u00e9fectueuses.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Quel est le meilleur AQL pour les batteries externes ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Il n\u2019existe pas de valeur optimale universelle. Fixez des r\u00e8gles propres \u00e0 chaque d\u00e9faut selon la s\u00e9curit\u00e9, le fonctionnement, l\u2019aspect, les obligations du march\u00e9, l\u2019historique du proc\u00e9d\u00e9 et les risques du plan d\u2019\u00e9chantillonnage retenu.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5. Combien de batteries externes l\u2019OQC doit-il inspecter ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Le nombre d\u00e9pend de la taille du lot, du niveau d\u2019inspection, de la norme d\u2019\u00e9chantillonnage, de l\u2019AQL et du type de plan. Utilisez la norme \u00e0 jour convenue pour obtenir la lettre-code, la taille de l\u2019\u00e9chantillon et les nombres d\u2019acceptation et de rejet.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">6. Faut-il utiliser l\u2019AQL pour les d\u00e9fauts critiques ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">De nombreux acheteurs utilisent une acceptation z\u00e9ro ou une r\u00e8gle distincte c=0 pour les d\u00e9fauts critiques convenus. Une qualification de s\u00e9curit\u00e9, des contr\u00f4les du proc\u00e9d\u00e9 et des v\u00e9rifications \u00e0 100% peuvent \u00e9galement \u00eatre n\u00e9cessaires, car l\u2019\u00e9chantillonnage final seul ne peut pas pr\u00e9venir tous les dangers.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">7. L\u2019OQC peut-il remplacer les essais fonctionnels \u00e0 100% ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Non. Les fonctions courantes, importantes et rapidement v\u00e9rifiables sont g\u00e9n\u00e9ralement mieux contr\u00f4l\u00e9es sur chaque unit\u00e9. L\u2019OQC pr\u00e9l\u00e8ve un \u00e9chantillon dans le lot termin\u00e9 et v\u00e9rifie que les exigences de lib\u00e9ration sont satisfaites.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">8. Faut-il tester la capacit\u00e9 de chaque cellule lors de l\u2019IQC ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pas n\u00e9cessairement. Le plan de contr\u00f4le peut pr\u00e9voir un contr\u00f4le \u00e0 100% de l\u2019identification, de la tension ou de la r\u00e9sistance, ainsi que des essais de capacit\u00e9 par \u00e9chantillonnage selon une m\u00e9thode d\u00e9finie. La d\u00e9cision d\u00e9pend des contr\u00f4les du fournisseur, du risque, du temps d\u2019essai et de l\u2019historique du proc\u00e9d\u00e9.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">9. Que faire apr\u00e8s un \u00e9chec \u00e0 l\u2019inspection AQL ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Mettez le lot en quarantaine, enregistrez l\u2019\u00e9chec, d\u00e9terminez le p\u00e9rim\u00e8tre concern\u00e9 et choisissez un traitement approuv\u00e9, tel que le rejet, un tri valid\u00e9 ou une retouche. La r\u00e9inspection doit suivre la proc\u00e9dure convenue apr\u00e8s le confinement ou l\u2019action corrective.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">10. Un rapport OQC conforme prouve-t-il que le produit est certifi\u00e9 ?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Non. L\u2019OQC est une activit\u00e9 de lib\u00e9ration des lots de production. Les justificatifs de s\u00e9curit\u00e9, de transport, de CEM, d\u2019environnement et d\u2019acc\u00e8s au march\u00e9 doivent \u00eatre examin\u00e9s selon les exigences qui leur sont applicables et pour la configuration exacte du produit.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Joignez le plan qualit\u00e9 \u00e0 la sp\u00e9cification d\u2019achat OEM<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Avant de passer commande, convenez de la r\u00e9vision du produit, des mat\u00e9riaux et composants critiques, des points de contr\u00f4le, des essais \u00e0 100%, des essais par \u00e9chantillonnage, des classes de d\u00e9fauts, du syst\u00e8me AQL, des r\u00e8gles de notification des modifications et des enregistrements fournis avec chaque exp\u00e9dition. Joignez la liste de contr\u00f4le \u00e0 la sp\u00e9cification d\u2019achat afin que l\u2019acheteur, l\u2019usine et l\u2019inspecteur tiers utilisent les m\u00eames limites.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pour un nouveau projet, commencez par l\u2019approbation des \u00e9chantillons et v\u00e9rifiez que la configuration approuv\u00e9e peut \u00eatre reproduite sur la ligne pr\u00e9vue. Examinez ensuite plus attentivement le premier lot de production en s\u00e9rie avant de passer \u00e0 une inspection r\u00e9duite ou \u00e0 une surveillance moins intensive.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Send YULIDA the model or product specification, target market, charging requirements, order quantity and proposed acceptance criteria. Ask the team to confirm the inspection scope, available records and any additional validation needed for the quoted build. <a href=\"https:\/\/www.yulidapower.com\/fr\/contactez-nous\/\">Request a model-specific quality plan for your OEM order<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Plan de contr\u00f4le qualit\u00e9 des batteries externes: IQC, IPQC, OQC and AQL A power bank quality control plan defines incoming checks (IQC), assembly controls (IPQC), finished-unit tests and outgoing lot inspection (OQC). For each check, agree on the method, frequency, acceptance limit and record. Use AQL sampling for suitable lot-inspection items, alongside the product\u2019s required safety and&#8230;<\/p>","protected":false},"author":1,"featured_media":18836,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"footnotes":""},"categories":[101],"tags":[],"class_list":["post-18840","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.yulidapower.com\/fr\/wp-json\/wp\/v2\/posts\/18840","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yulidapower.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yulidapower.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yulidapower.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yulidapower.com\/fr\/wp-json\/wp\/v2\/comments?post=18840"}],"version-history":[{"count":5,"href":"https:\/\/www.yulidapower.com\/fr\/wp-json\/wp\/v2\/posts\/18840\/revisions"}],"predecessor-version":[{"id":25015,"href":"https:\/\/www.yulidapower.com\/fr\/wp-json\/wp\/v2\/posts\/18840\/revisions\/25015"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.yulidapower.com\/fr\/wp-json\/wp\/v2\/media\/18836"}],"wp:attachment":[{"href":"https:\/\/www.yulidapower.com\/fr\/wp-json\/wp\/v2\/media?parent=18840"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yulidapower.com\/fr\/wp-json\/wp\/v2\/categories?post=18840"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yulidapower.com\/fr\/wp-json\/wp\/v2\/tags?post=18840"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}