Power bank compliance is model-specific, market-specific, and sensitive to design changes. CE, FCC, RoHS, UN 38.3, IEC 62133-2, China CCC, and Qi or Qi2 address different legal, transport, safety, or interoperability requirements. Before ordering, verify the exact model, report scope, issuing body, applicable standard, and current document status.
What Do the Main Power Bank Compliance Documents Cover?
| Requirement | Purpose | What Buyers Should Verify |
|---|---|---|
| CE marking | The manufacturer’s declaration that a product meets applicable EU requirements; it is not a general EU approval. | EU Declaration of Conformity, relevant legislation and standards, matching model, technical reports, and responsible economic operator. |
| RoHS | EU restrictions on specified hazardous substances in electrical and electronic equipment. | Test or matterial evidence, model and bill-of-matterial scope, supplier declarations, and any exemptions used. |
| FCC | US radio-frequency requirements. The route depends on the product’s functions; wireless power may involve Part 15, Part 18, or both. | Rule part, FCC ID when certification applies, SDoC information where applicable, test report, responsible party, and operating modes. |
| UN 38.3 | Lithium-cell and battery transport testing under the UN Manual of Tests and Criteria. | Manufacturer, laboratory, report number and date, model, Wh rating, tests and results, manual revision, and signature in the test summary. |
| IEC 62133-2 | Safety requirements and tests for portable sealed secondary lithium cells and batteries. | The exact cell or pack model, report edition and amendment, laboratory, report number, and relationship to the finished product. |
| China CCC | Mandatory certification for products in the applicable China catalogue, including mobile power supplies. | Certificate number and status, legal manufacturer and site, product model, applicable GB standards, certification mark, and traceability details. |
| Qi / Qi2 | WPC certification for a finished wireless-charging product’s interoperability and performance. | WPC ID, brand, product name, part number, power profile, certification date, and matching official database listing. |
Documents to Request Before a Bulk Order
- Final specification showing model, battery Wh, charging protocol, rated input and output, wireless power, ports, cables, and firmware.
- Laboratory, report number, issue date, applicable standard and edition, test result, and certificate status.
- UN 38.3 test summary for the battery type used in the shipment.
- EU Declaration of Conformity and supporting technical evidence for EU orders.
- CCC certificate and matching model information for products within China’s compulsory scope.
- WPC listing and WPC ID before using the terms Qi Certified or Qi2 Certified.
- Change-control record covering the approved battery, PCBA, coil, magnets, housing, firmware, and electrical ratings.
When Can a Design Change Affect Existing Evidence?
A new battery cell, protection circuit, charging IC, PCBA layout, wireless coil, magnet, shielding matterial, firmware, housing, cable, connector, rated power, brand, or model number may require formal review or re-testing. A component used in a previously tested design does not automatically make a different finished product compliant.
Important: “Compatible with Qi,” “uses a Qi chipset,” and “Qi Certified” are different claims. Describe a finished product as Qi Certified or Qi2 Certified only when the WPC certification and database entry match it.
How YULIDA Reviews a Compliance Request
- Confirm the market
Identify target, sales channel, shipment method, claims, and required date. - Lock the specification
Document the battery, PCBA, ports, power, wireless functions, firmware, housing, and model. - Map requirements
Match the configuration to product, transport, EMC, matterial, and wireless rules. - Review evidence
Compare reports with the sample and arrange testing when the scope does not match. - Release documents
Provide current files for the approved order, with redaction where appropriate. - Control changes
Review substitutions before production against the approved specification.
Frequently Asked Questions
Are all YULIDA power bank models covered by the same certificates?
No. Evidence depends on the model, battery, PCBA, functions, target market, and production configuration. Request the package matching the quoted model and approved sample.
Is UN 38.3 enough for air shipment?
No. Shippers must also follow current carrier, packaging, state-of-charge, labelling, documentation, and dangerous-goods rules for the route.
Official Reference Sources
How to use these sources: These links lead to the responsible institutions or standards organization. Requirements, standards editions, test methods, and carrier rules can change. Confirm the current scope for the exact product configuration, destination market, and shipment before relying on any report or declaration.
- European Union: CE marking
- European Commission: RoHS Directive
- US FCC: Radio-frequency device authorization
- UNECE: UN Manual of Tests and Criteria Rev.8 and Amendment 1
- IEC: IEC 62133-2
- CNCA: CCC requirements for lithium-ion batteries and power banks
- Wireless Power Consortium: certified product database

